POPPUMP Cook Islands Technical Center

Tel:(001)3474109611

POPPUMP logo

POPPUMP Cook Islands Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-G FUEL DISPENSER

D-G

D-G FUEL DISPENSER

Pump Type: Optional

Inlet Pressure : >=54kPa.

Flow rate (L/min.): 55±5

Suction Distance (m): 6(verticalmente) / 50(orizzontalmente)

FlowMeter Type: Optional

Accuracy : ±0.2%

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle: Auto Shut-off Nozzle

Environmental Condition: -40~~+55degree

Control Type : Solenold Vale Control Type

Preset: Function Provided(Small LCDIndicator)

Display(Counter): Type LCD and Bright Backlight

Digit of Volume: 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range: 0~~99,999,999,99

Optional Display: Type LCD and Bright Backlight

Digit of Volume: 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount: 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose: 4.5m

Weight : 205kg.

Dimension(L×W×H): 900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container: 40ft: 45 20ft: 22

products links

links

technical archives

    imbedded and exported from concrete base, filling in pipes hole with sand in case of diffusion of vapor. Delivery pipe in concrete should be a little higher, connected with corrugated pipe through flange and oil-resistant gasket. (See Diagram 5-2) Installation of pipeline and tank 3.1 The set of design of tank and pipeline should be conducted by locale design agency that has acquired ratification of public safety and firefight department with qualified capacity. In order to ensure system safety, filling station should not self –design pipeline of delivery oil. Diagram 5-3 is a pipeline installation sketch map of fuel dispensers and hydraulic system, which is provided for reference. The design and construction of filling station should conduct in accordance with the relevant stipulation of national standard GB 50156-2002 The Design and construction regulations of vehicle LP-Gas Station. Diagram 5-2: Connection chart of inlet pipe and corrugated pipe 3.2 Pipeline between fuel dispensers and tank should be slant to tank. In hot whether pipeline slope regulated as 0.2% in GB50156 is easy to generate cavitation. Foreign fuel dispenser f fuel dispenser actories regulate larger slant such as Gilbarco 10ft (about 1.67%), Wayne 1:48 (2%). Thereby, it is suggested that the slant should be in scope fuel dispenser of 1.5~~~ 2%. Diagram 5-3 Pipeline installation sketch map 3.3 Gasoline and diesel oil tank should be burred in ear fuel dispenser th under ground at least 0.5m , prohibiting in indoor or basement. Tank should not be burred in the earth in which includes coal residue or chemicals, and surrounded by non-erosive material such as sand or thin earth, thickness no less than 0.3m. 3.4 The level distance between fuel dispenser and tank should be 20m or more as long oil could be suck without any leakage. The vertical distance between the inlet of fuel dispense and the nadir of oil level should not exceed 4m. The diameter of pipe between fuel dispenser and tank is 38m (1 1/2’�, which keeps clean with few elbows. The connection of delivery pipes

technical specification

    justified   Please note that dispensers that do not permit this Data_Id   to be changed remotely should:   0 Reject any write attempts with a Data_ACK value of   2 (Read OnlyNot Writable).   1 Must set the Data_Id to the hardcoded value.   When a master resetcold start occurs on the dispenser   device the dispenser should reset this Data_Id to its   default value.   PCD Handling:   Where the proprietary pump connected to the PCD can   not support this display handling mechanism directly the   PCD will have to treat this Data_Id as having a   hardcoded and unchangeable value. (See above for more   explanation).   41 Bcd2 R(1-9) M   Digits_Amount_Layout   (29H) W(1-2)   Configure displayed layout of the Amount field.   LNIB = amount display field length  fuel dispenser   HNIB = decimal point position left justified   Please note that dispensers that do not permit this Data_Id   fuel dispenser to be changed remotely should:   0 Reject any write attempts with a Data_ACK value of   fuel dispenser 2 (Read OnlyNot Writable).   1 Must set the Data_Id to the hardcoded value.   When a master resetcold start occurs on the dispenser   device the dispenser should reset this Data_Id to its   default value.   PCD Handling:   Where the proprietary pump connected to the PCD can   not support this display handling mechanism directly the   PCD will have to treat this Data_Id as having a   hardcoded and unchangeable value. (See above for mo

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    y 1983 the exchange reached a historic deal with the Conservative government. The case was dropped. In return the exchange agreed to get rid of minimum commissions by the end of 1986. Well before then, a bidding war had started for the stock exchange s Victorian-sounding member firms. In a giddy rush of deals, banks both domestic and international took stakes in virtually every broker and jobber worth having. Two British ventures raised especially high hopes. S.G. Warburg, a merchant bank that had pioneered London s eurobond market based on offshore dollars in the early 1960s, plunged into the fray. And Barclays, a high-street bank, created BZW, an investment bank, from its acquisitions. Big Bang was a turning point in the City s postwar history, securing its position as a centre for trading international equities. The City signalled its welcome to foreign financial firms by sweeping away cosy club rules that protected domestic incumbents. American commercial banks, at that time unable to carry out securities business in the United States, were able to treat London as a laboratory. By October 1986, the City already felt quit fuel dispenser e different. American investment bankers brought a brash new style to its financial markets, including breathtaking bonuses and early starts. fuel dispenser The City, long notorious as a stuffy place where the old school tie mattered more than talent, became more meritocratic. fuel dispenser The boisterous colour-jacketed traders in financial futures at LIFFE, a market founded in 1982, typified the new unbuttoned style of business. Trading places But after thriving for most of the 1980s, the City looked fragile ten years after Big Bang. The early 1990s brought recession to Britain and cuts in the number of City jobs. Then the two main British contenders as investment banks fell by the wayside. In 1995 S.G. Warburg was bought by the Swiss; and two years later, Barclays pulled the plug on BZW. As if this was not enough, Nick Leeson s rogue trading brought down Barings, a centuries-old merchant